SEPC Ltd

NSE
BUY

1W Return

1M Return

6M Return

1Y Return

3Y Return

Start SIP in SEPC Ltd
Stock Performance
52 Week Low - High
Today’s Low - High

Open

Prev. Close

Total Traded Value

View details of Market Depth
Fundamental

Market Cap (in crs)

Face Value

Turnover (in lacs)

Key Metrics
Qtr Change %
27.62% Fall from 52W High
-13.2
TTM PE Ratio
Negative PE TTM
-701.8
Price to Book Ratio
Above industry Median
2.6
Dividend yield 1yr %
0
TTM PEG Ratio
PEG TTM is negative
-7.3
RSI
RSI is mid-range
52.2
MFI
MFI is mid-range
51.1

SEPC Ltd Key Financials

View more

*All values are in ₹ Cr.

*All values are in ₹ Cr.

*All values are in ₹ Cr.

*All values are in ₹ Cr.

SEPC Ltd shareholding Pattern

Promoter
27%
Foreign Institutions
0.5%
Domestic Institutions
25.2%
Public
47.4%
Promoter
27.8%
Foreign Institutions
0.4%
Domestic Institutions
26.6%
Public
45.2%
Promoter
27.8%
Foreign Institutions
0.3%
Domestic Institutions
37.5%
Public
34.4%
Promoter
26.7%
Foreign Institutions
0.2%
Domestic Institutions
39.3%
Public
33.8%
Promoter
31.1%
Foreign Institutions
0.2%
Domestic Institutions
40.8%
Public
27.9%
Promoter
47.6%
Foreign Institutions
0.2%
Domestic Institutions
40.8%
Public
11.4%

SEPC Ltd Technical Analysis

Moving Averages Analysis
Moving Averages Analysis
Current Price
Bullish Moving Averages
8
Bearish Moving Averages
8
5Day EMA
20.20
10Day EMA
20.10
12Day EMA
20.00
20Day EMA
19.80
26Day EMA
19.80
50Day EMA
20.10
100Day EMA
20.10
200Day EMA
18.50
5Day SMA
20.20
10Day SMA
20.10
20Day SMA
19.60
30Day SMA
18.70
50Day SMA
20.00
100Day SMA
21.20
150Day SMA
20.30
200Day SMA
18.50
Delivery & Volume
Resistance & Support
20.07
Pivot
Resistance
First Resistance
20.33
Second Resistance
20.62
Third Resistance
20.88
Support
First Support
19.78
Second support
19.52
Third Support
19.23
Relative Strength Index
52.24
Money Flow Index
51.08
MACD
0.23
MACD Signal
0.13
Average True Range
1.18
Average Directional Index
17.37
Rate of Change (21)
10.47
Rate of Change (125)
20.54
Peer comparison
Compare
Company
Market Price
Market Cap
52W Low
52W High
PSP Projects Ltd.
2455.2
599.9
846
Salasar Techno Engineering Ltd.
3291.23
8.08
33.95
Capacit'e Infraprojects Ltd.
2629.07
127.85
323.55
Gensol Engineering Ltd.
-
-
-
Bondada Engineering Ltd.
-
-
-
KP Green Engineering Ltd.
-
-
-

SEPC Ltd Company background

Founded in: 2000
Managing director: N K Suryanarayanan
SEPC Limited (Formerly Shriram EPC Limited) which is a part of the Shriram EPC Group has diverse interests across Project Engineering Construction. The company provides endtoend solutions to engineering challenges, offering multi disciplinary design, engineering, procurement, construction and project management services. SEPC is focused on providing turnkey solutions for ferrous non ferrous, cement, aluminum, copper and thermal power plants, water treatment transmission, renewable energy, cooling towers material handling. The Company along with the Joint operators enters into contracts with the customers for execution of the projects.Shriram EPC was incorporated in June 12 of the year 2000, headquartered in Chennai (formerly known as Madras), Tamil Nadu, with other offices in Mumbai, New Delhi, Kolkata and Beijing, and WTG Cooling tower factories in Puducherry, Chennai and Umbergaon (Gujarat). It offers the services include detailed design engineering, material procurement overall project and construction management services and also one of Indias leading 250KW wind turbine generator (WTG) manufacturers. The companys businesses are categorized into two segments engineering, procurement and construction (EPC) projects and development, sale and maintenance of WTGs. EPC projects of the company experienced and footprint of the same reached across 16 states in India, In WTG section the company also completed wind energy projects throughout India, particularly in south India, and internationally in Zambia and France. The companys network covers through Joint Venture Partners with Leitwind (Leitwind BV (Leitwind)) and Hamon (Hamon Thermal Europe, an affiliate of Hamon Cie (Hamon Group), Technology partnership with CPT Perco, Angerlehner, Danieli (Italy), Waterburry (USA), SSIT (China), Danielli (Italy) SMS, Swemco (USA) and Aker Kvaerner (USA). Shriram EPC Ltd began its operations in the biomass power plants business in December 2000 with the execution of the first biomass power plant project in Andhra Pradesh, the biomass power plants business is engaged in the design, engineering and construction of thermal biomassbased power plants. The company commenced its process and metallurgy business in the year 2003. While in 2004, the company acquired of the cooling towers business of Shriram Tower Tech Limited, municipal services business of water and wastewater management and water distribution systems and pipe rehabilitation and the business of erection, testing and commissioned wind electric generators. Shriram EPC executed the joint operation agreement with the Hammon Group in the same year 2004 to carry out projects regarding cooling tower solutions. Shriram Engineering Construction Company Limited was merged with the company with effect from April 1, 2004, since both companies were in the same line of business, namely, construction engineering. During the year 2005 and 2006, the companys Investment made by UNO Investments and Bessemer Venture Partners Trust respectively. The company received certification by DEWI OCC for designing and manufacturing 250 KW wind turbine in August of the year 2006. The MoU with Leitner Technologies for manufacture and marketing of megawatt class wind turbines was happened in November of the identical year. On January 16, 2007 we entered into a Joint Venture Agreement with Leitner B.V., Netherlands to set up Leitner Shriram Manufacturing Limited, an Associate company formed for the purposes of manufacturing of megawatt class wind turbines and components and in February 3, 2007, the company entered into a Joint Venture Agreement with Leitner B.V., Netherlands to set up Shriram Leitwind Limited, a Subsidiary company, formed for the purposes of marketing of wind turbines, wind farm development, and erection and commissioning of wind turbines. In February 2007 the Joint Venture Agreement was made with Hamon Thermopack Engineers Private Limited, in March an exclusive license was received from Hamon Shriram Cottrell Inc to design, manufacture and sell certain air pollution control products and systems Hamon ResearchCottrell, Inc and also the company entered into a memorandum of understanding on August 28, 2007 with Bessemer Venture Partners Trust (BVP) for power generation through renewable sources. In September 2007 the company successfully installed 1.35 MW WTG demo machine in Tamilnadu. The company work on a projecttoproject basis with Chevalier Pipe Technologies Limited, whereby the company have been granted license to use its rib loc technology in India. Shriram EPC Ltd is moving with continues action to generate strong financial returns and create a worldclass engineering, procurement and construction company, with a particular focus in renewable energy and also be a developer and manufacturer of technologically advanced WTGs. The companys objective is to expand and enhance the presence throughout India and abroad by capitalizing on competitive strengths, local experience, and familiarity with local working conditions. Intend to target specific project segments and industries where there is high potential for growth and where enjoy competitive advantages. The company also maintains the relationships with clients and strategic partners of the company to attain the same all above.The Company merged business of marketing Company, Shriram Leitwind Ltd with LSML, the associate company. The Associate Company, Orient Green Power Company Ltd. (OGPL) finalised plans for an Initial Public Offer (IPO) to raise, around Rs.900 crores to finance expansion of its business. Leitner Shriram Manufacturing Ltd( LSML) set up an art of facility at Gummidipoondi for the manufacture of the wind turbines and the trial production commenced in March 2009, with the formal inauguration taking place in September 2009.During the year 201213, the Company commissioned 300 TPD Cattle Feed Project at Karunagapally, Kalletumkara, Kollam Ammonia Liquid treatment project for Rourkela Steel Plant was commissioned.During the year 201819, the Companys wholly owned subsidiary, Shriram EPC FZE Sharjah acquired 70% in the equity capital of Shriram EPC Arkaan LLC and resultant to this, Shriram EPC Arkaan LLC became the step down subsidiary of the Company.During the year 202021, the Companys name changed from Shriram EPC Limited to SEPC Limited effective from February 12, 2021. The project for constructing Balance of Plant (BoP) for 1.2 MTPA Mini Mill Project in Sohar, Sultanate of Oman was commissioned. The Companys step down subsidiary Shriram EPC Arkaan LLC implemented the onsite portion of the project at Sohar, Sultanate of Oman.During 2022, the Company in joint venture with Mokul Infrastructure Private Limited (Mokul Shriram EPC JV (MSJV) completed Sewerage, Storm water and Trunk Sewer Pipeline Project along with Civil Works and Road Works at Al Qibla area, for Basra Governorate, Basra, Iraq valued at USD 236 Million.
Read More

SEPC Ltd FAQs

SEPC Ltd shares are currently priced at 20.05 on NSE and 20.07 on BSE as of 4/25/2024 12:00:00 AM. Please be aware that stock prices are subject to continuous fluctuations due to various factors.

The past 1-year return of SEPC Ltd [SEPC] share was 78.38. The SEPC Ltd [SEPC] share hit a 1-year low of Rs. 7.43 and a 1-year high of Rs. 27.7.

The market cap of SEPC Ltd is Rs. 2826.68 Cr. as of 4/25/2024 12:00:00 AM.

The PE ratios of SEPC Ltd is 0 as of 4/25/2024 12:00:00 AM.

The PB ratios of SEPC Ltd is 2.36 as of 4/25/2024 12:00:00 AM

You can easily buy SEPC Ltd shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Open Demat Account
or Resume your Application
+91 -

personImage