Waa Solar Share Price

BSE
WAA •
BUY

1W Return

1M Return

6M Return

1Y Return

3Y Return

The current prices are delayed, login or open an account for live prices.
Start SIP in Waa Solar Ltd
Stock Performance
52 Week Low - High
Today’s Low - High

Open

Prev. Close

Total Traded Value

View details of Market Depth
Fundamental

Market Cap (in crs)

Face Value

Turnover (in lacs)

Key Metrics
Qtr Change %
37.59% Fall from 52W High
-9.7
TTM PE Ratio
Price to Book Ratio
Low in industry
1.2
Dividend yield 1yr %
0
TTM PEG Ratio

Waa Solar Ltd shareholding Pattern

Promoter
68.5%
Public
31.5%
Promoter
69.8%
Public
30.3%
Promoter
69.8%
Public
30.2%
Promoter
69.8%
Public
30.2%
Promoter
69.8%
Public
30.2%
Promoter
69.8%
Public
30.2%

Waa Solar Ltd Technical Analysis

Moving Averages Analysis
Moving Averages Analysis
Current Price
Bullish Moving Averages
12
Bearish Moving Averages
4
5Day EMA
157.50
10Day EMA
155.50
12Day EMA
155.50
20Day EMA
156.60
26Day EMA
157.80
50Day EMA
162.40
100Day EMA
164.60
200Day EMA
153.10
5Day SMA
154.40
10Day SMA
153.00
20Day SMA
155.70
30Day SMA
158.70
50Day SMA
163.60
100Day SMA
174.20
150Day SMA
167.60
200Day SMA
162.40
Delivery & Volume
Day
Combined Delivery Volume- 64800 Rs
NSE+BSE Traded Volume- 131200 Rs

Week
Combined Delivery Volume- 60400 Rs
NSE+BSE Traded Volume- 106200 Rs

Month
Combined Delivery Volume- 27314 Rs
NSE+BSE Traded Volume- 43390 Rs

Resistance & Support
163.80
Pivot
Resistance
First Resistance
176.60
Second Resistance
189.80
Third Resistance
202.60
Support
First Support
150.60
Second support
137.80
Third Support
124.60
Relative Strength Index
54.62
Money Flow Index
68.61
MACD
-2.32
MACD Signal
-3.76
Average True Range
9.79
Average Directional Index
22.93
Rate of Change (21)
3.25
Rate of Change (125)
23.13

Waa Solar Ltd Company background

Founded in: 2009
Managing director: Amit Khurana
Waa Solar Limited was incorporated as a Private Limited Company with the name Waa Solar Private Limited on November 9, 2009. The status of the Company changed to Public Limited Company and Company name was changed to Waa Solar Limited on February 19, 2018. The Company was promoted by Mr. Hitesh Doshi and Mr. Viren Doshi. On May 8, 2010, the company was taken over by the Promoter M/s. Madhav Power Private Limited (MPPL) by entering into solar power projects in Gujarat. MPPL is the Promoter and Holding Company holds 34,19,982 Equity Shares constituting 70.03% of stake in the Company. On May 21, 2010, Gujarat Urja Vikas Nigam Limited (GUVNL) awarded the work of setting up of Solar Photovoltaic Grid Interactive Power Plant of 10MW capacity at Village Nayka, TalukaSami, District Patan, to produce the Electric Energy and for sale of entire electrical energy, so produced, for commercial purpose from such project to GUVNL. GUVNL entered into Power Purchase Agreement (PPA) dated May 21, 2010 and agreed to purchase such power through distribution companies (Discom). In March 2011, the company acquired 3,71,502 Square Meter (approx 92 acres) of agriculture land of Rs. 392.80 Lakhs for setting up Solar Photovoltaic Grid Interactive power plant of 10MW at Village Tikar (Parmar), Taluka Muli, District Surendranagar. The company within a period of 11 months of acquisition of land completed 10.25 MW (DC) capacity of ground mounted Solar Photovoltaic power project in the area of (approx 59.80 acres) at Village Tikar (Parmar), Taluka Muli, District Surendranagar, Gujarat, installed 63,990 Photovoltaic (PV) modules in phase I having total capacity of 4.9592 MW and 64,875 PV modules in phase II having total capacity of 5.9207 MW with 14 inverter transmission station. The Company received certificate of commissioning of 10.25 MW from Gujarat Energy Development Agency (GEDA) on February 27, 2012. Out of total land area of 92 acres of land situated at Village Tikar (Parmar), Taluka Muli, District Surendranagar, Gujarat, the company has set up Solar Photovoltaic power project in the area of approx 59.80 acres and balance area of approx 32 acre land has been given on lease basis to M/s. S.J. Green Park energy Private Limited for setting up Solar Photovoltaic power project of 5.125 MW w.e.f May 9, 2012 for a tenure of 25 years at a monthly rent of Rs. 1.00 Lakhs with the incremental rent of 5% every year. In January 2013, the Company commissioned 100 KW solar power plant at Bhopal Airport.The Company floated Madhav Solar (Karnataka) Private Limited (MSKPL) on September 3, 2013 for setting up of Solar Photovoltaic Grid Interactive Power Plant of 10MW capacity at Sira Taluk, Tumur District. In 2014, it floated wholly owned subsidiary company, Madhav Solar Private Limited (MSPL) on August 13, 2013 for setting up of Solar Photovoltaic Grid Interactive Power Plant of 4MW capacity at Village Buha, Tehsil Budhlada, Dist. Mansa. It further floated subsidiary company, Madhav Solar (Vadodar Rooftop) on March 13, 2014 for setting up of Solar Photovoltaic Grid Interactive Power Plant of 4 to 6 MW capacity at Vadoadara.In June, 2018 the Company came up with an IPO of 20,00,000 Equity Shares by raising equity fund aggregating Rs 32.2 Crores .
Read More

Waa Solar Ltd FAQs

You can easily buy Waa Solar Ltd shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Open Demat Account
+91 -

personImage
Open Demat Account
+91 -