Promax Power Share Price

BSE
PROMAX •
BUY

1W Return

1M Return

6M Return

1Y Return

3Y Return

The current prices are delayed, login or open an account for live prices.
Start SIP in Promax Power Ltd
Stock Performance
52 Week Low - High
Today’s Low - High

Open

Prev. Close

Total Traded Value

View details of Market Depth
Fundamental

Market Cap (in crs)

Face Value

Turnover (in lacs)

Key Metrics
Qtr Change %
51.48% Fall from 52W High
-3.1
TTM PE Ratio
Price to Book Ratio
Above industry Median
4.1
Dividend yield 1yr %
0
TTM PEG Ratio

Promax Power Ltd shareholding Pattern

Promoter
71.2%
Public
28.7%
Promoter
64.8%
Public
35.2%
Promoter
64.8%
Public
35.2%
Promoter
72.3%
Public
27.6%
Promoter
74.7%
Public
25.2%
Promoter
74.7%
Public
25.3%

Promax Power Ltd Technical Analysis

Moving Averages Analysis
Moving Averages Analysis
Current Price
Bullish Moving Averages
7
Bearish Moving Averages
9
5Day EMA
43.60
10Day EMA
44.10
12Day EMA
44.40
20Day EMA
45.60
26Day EMA
46.30
50Day EMA
47.80
100Day EMA
48.00
200Day EMA
42.90
5Day SMA
43.40
10Day SMA
42.90
20Day SMA
46.60
30Day SMA
49.20
50Day SMA
47.80
100Day SMA
51.70
150Day SMA
49.70
200Day SMA
43.30
Delivery & Volume
Day
Combined Delivery Volume- 17500 Rs
NSE+BSE Traded Volume- 17500 Rs

Week
Combined Delivery Volume- 12000 Rs
NSE+BSE Traded Volume- 13000 Rs

Month
Combined Delivery Volume- 33888 Rs
NSE+BSE Traded Volume- 47777 Rs

Resistance & Support
45.04
Pivot
Resistance
First Resistance
45.04
Second Resistance
45.05
Third Resistance
45.05
Support
First Support
45.03
Second support
45.03
Third Support
45.02
Relative Strength Index
46.69
Money Flow Index
14.07
MACD
-1.90
MACD Signal
-1.69
Average True Range
2.31
Average Directional Index
14.99
Rate of Change (21)
-14.29
Rate of Change (125)
66.81

Promax Power Ltd Company background

Founded in: 2017
Managing director: Vishal Bhardwaj
Promax Power Limited was originally incorporated as Promax Power Private Limited on August 21, 2017 by Registrar of Companies. Subsequently, the status of the Company got converted into Public Limited and a fresh Certificate of Incorporation was issued by Registrar of Companies, Chandigarh, upon conversion dated April 20, 2021 in the name of Promax Power Limited. The Company is founded and promoted by Chandigarh based Mr. Vishal Bhardwaj and his wife Mrs. Shweta Bhardwaj in year 2017 to take over the business of M/s. Promax Technologies, a sole proprietorship firm of Vishal Bhardwaj as a going concern and to continue the similar and related business activity in the name of the Company. Since then, M/s. Promax Technologies, was into undertaking of EPC projects (Engineering, Procurement and construction) of Electric substation Transmission line, Power distribution, Hydro, Solar power stations etc. operating since 2006. Thereafter, the Company set up a manufacturing plant in Raipura in 2015. Till year 2019, there was no major activity in the Company. In 2020, the Company acquired the Project Management and Execution Business Undertaking of M/s. Promax Technologies as a going concern on a slump sale via Agreement dated March 31, 2020.The Company made an IPO of 16,00,000 Equity Shares by raising funds from public aggregating to Rs. 1.6 Crore in October, 2021.Promax Power is an ISO 14001:2015 and ISO 45001:2018 certified organization engaged in the business of Execution Engineering, Procurement, Construction (EPC Power Solar) for Electrification, Power Substations, Underground Cabling from 11kV to 220kV , erection of poles, installation of floodlights etc. which also includes design and detailed engineering for EHV substations and transmission lines. Civil Infrastructure Projects such as Industrial buildings and Turnkey execution of water infrastructure management projects such as water transmission and distribution work. The Company operate from different location across Punjab, West Bengal, Delhi and Karnataka. It also undertake electrification works from complete installation to new additions to circuits, from mains distribution (220 KV) to lighting installations.The Company have excellent project execution teams in Transmission Line who have expertise in getting all requisite clearances from statutory authorities like Transco, Discoms, Railways, Telecom, etc. The Company have done over 20 Line projects on a EPC Turnkey basis. It has excellent relationships with leading tower parts and conductor manufacturers. Civil construction work in sewerage treatment projects requires high technology and skill. STP consists sludge collector, pumping stations, mixing chambers and storage and distribution system, where the quality of civil work is always on priority due usages of various chemical compound.The Company is constructing high rise residential building, commercial building like shopping mall, sports complex, universities, private offices and government office complex with modern technology and deliver high quality. The work involves the landscaping work to gardens to meet the aesthetic satisfaction of client and customers. PreEngineered Buildings (PEB) are the buildings which are engineered at a factory and assembled at site. Usually PEBs are steel structures. Builtup sections are fabricated at the factory to exact size, transported to site and assembled at site with bolted connections. This type of structural concept is generally used to build industrial buildings, metro stations, warehouses etc.
Read More

Promax Power Ltd FAQs

You can easily buy Promax Power Ltd shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Open Demat Account
+91 -

personImage
Open Demat Account
+91 -