Schneider Electric Infrastructure Share Price

    821.35
    +0.05 (0.01%)
    SCHNEIDER • 12 Nov, 2025 | 03:29 PM
    Buy
    with MTF at2.85xleverage

    1Y Annualised Return

    7.72%

    3Y Annualised Return

    86.33%

    5Y Annualised Return

    60.85%

    10Y Annualised Return

    16.67%

    The current prices are delayed, login or Open Demat Account for live prices.

    Schneider Electric Infrastructure Stock Performance

    1W Return-7.71
    1Y Return8.19
    Today's Low809.1
    Prev. Close821.30
    Mkt Cap (Cr.)19,638.48
    1M Return-0.95
    3Y Return398.54
    52-Week High1052
    Open821.95
    PE Ratio79.96
    6M Return35.02
    Today's High825
    52-Week Low540
    Face Value2

    Schneider Electric Infrastructure Company background

    Founded in: 2011
    Managing director: Udai Singh
    Schneider Electric Infrastructure Limited was initially incorporated on March 12, 2011 as Smartgrid Automation Distribution and Switchgear Limited. Subsequently, the name of the Company was changed to Schneider Electric Infrastructure Limited on December 8, 2011 and a fresh Certificate of Incorporation was issued by the Registrar of Companies, Gujarat.The Company specialises in manufacturing, designing, building, and servicing advanced products and systems for electricity networks. It offers distribution, medium power, and special transformers substation automation systems, including power management systems, controllers and RTUs, communication elements, graphic user interfaces, engineering tools, SCADA and EMS gateways, and simulation tools and ring main units. It also provides medium voltage distribution and grid automation products, such as Easergy T300, a remote terminal unit EasyPact EXE, a vacuum circuit breaker medium voltage switchgear microgrids digital substations and Ecofit, a medium and low voltage equipment, as well as EcoStruxure grid, an IoTenabled open and interoperable platform.The business of the company comprises of the demerged undertaking that was transferred to it by ALSTOM TD pursuant to the Scheme of Demerger, which became effective on November 26, 2011. The company has 9 manufacturing facilities in India spread over 5 locations, i.e. in Vadodara (3 units), Kolkata (2 units), Chennai (1 unit), Naini (2 units) and Noida (1 unit) and has 4 regional offices and 13 branch/sales offices located across the country.The companys major customers are electrical distribution (utilities) and power generation companies in public as well as private sector and companies in electrointensive industry particularly oil gas and metals related.During FY 201718, the Company received several major orders of Solution Business in the turnkey project business segment as below:Sterlite Technologies Limited placed an order with Schneider Electric Infrastructure Limited for 110 kV Intake Substation along with associated transmission lines and civil works for their expansion project at Aurangabad (Maharashtra).Reliance Infrastructure Limited, an existing customer awarded an order for Design, Supply Installation of SCADA compatible two numbers of E House for Mumbai electrical distribution.The Company won an order for Installation, Testing and Commissioning of 33/11 kV S/SforTibbia College, Delhi from BSES Yamuna Power Limited.Grasim Industries Limited, a Birla Group company, awarded an order or Supply, Installation, Testing Commissioning of SCADA compatible 66/11 kV Intake Substation for their plant expansion near Vadodara (Gujarat).The Company received an order on Design, Supply and Installation of 132/11 KV Bay extension for JSW Steel plant at Salem (Tamil Nadu). The Company received an order from LT (EESL) for HeadEnd System for Smart Meters in UP Haryana.During FY 201718, the Company executed glass manufacturing project of Design, Engineering, Supply, Installation, Testing and Commissioning of 11 kV Switchgears, Transformers and associated equipments required for providing input supply to Saint Gobain plant expansion in Chennai. The project was successfully commissioned within the contractual timelines and to the complete satisfaction of customer.In FY 201718, the Company completed Supply, Installation, Testing and Commissioning of 11/132 kV Transformer Extension Bay for Assam Electricity Generating Power Station. MVA generating transformers were successfully designed manufactured supplied with complete installation, testing and commissioning at site.The Company supplied and commissioned equipment for 500 MW solar projects, increasing their share of total capacity to 3.5 GW in 201718. In 2018, the Company completed the execution of the integrated greenfield Smart City, Atal Nagar. It commissioned the Glass Plant, Project GAURAV in Aurangabad. It completed new 33/11 kV GIS SubStation on turnkey basis for BSES Yamuna Power Limited (BYPL), Delhi.In 2024, Company launched EasySet, a Medium Voltage AirInsulated Indoor Switchgear assembly that provides easy Operation, Monitoring, Maintenance Userfriendly features to meet all Electrical Distribution needs with set options of innovative digital solutions.In FY 2025, Company launched SF6free switchgear lineup along with our Power Train Module to boost reliability and reduce environmental impact. A leading power company in Nepal was undertaking the rehabilitation of multiple aging 33/11 kV substations across the country of expanding transmission lines and boosting transformer reliability. The turnkey containerised solution comprising mainly of EHouse substations set a new benchmark for rapid, reliable infrastructure deployment in FY25.

    Schneider Electric Infrastructure Financial Highlights


    As of Sep '25, Schneider Electric Infrastructure’s market capitalisation stood at ₹19,638.48 crores. Shareholding as of Sep '25 shows promoters holding 75%, with FIIs at 3.1%, DIIs at 3.3%, and public at 18.6%.

    Schneider Electric Infrastructure Share Price Today


    As of 12 Nov 2025, Schneider Electric Infrastructure share price is ₹821.4. The stock opened at ₹822 and had closed at ₹821.3 the previous day. During today’s trading session, Schneider Electric Infrastructure share price moved between ₹809.10 and ₹825.00, with an average price for the day of ₹817.05. Over the last 52 weeks, the stock has recorded a low of ₹540.00 and a high of ₹1,052.00. In terms of performance, Schneider Electric Infrastructure share price has increased by 49.1% over the past six months and has increased by 7.72% over the last year.
    Read More
    Schneider Electric Infrastructure SIP Return Calculator

    Over the past

    1 year
    3 years
    5 years
    Total Investment of ₹3,00,000
    Monthly SIP of 5,000 would have become 19,11,528 in 5 years with a gain of 16,11,528 (+537.18%)
    View details of Market Depth

    Schneider Electric Infrastructure Fundamental

    Market Cap (in crs)

    19,638.48

    Face Value

    2

    Turnover (in lacs)

    915.44

    Key Metrics

    Qtr Change %
    52.10% Gain from 52W Low
    -7.5
    Dividend yield 1yr %
    0

    Schneider Electric Infrastructure Shareholding Pattern

    Promoter
    75%
    Foreign Institutions
    3.1%
    Mutual Funds
    2.7%
    Domestic Institutions
    3.3%
    Public
    18.6%
    Promoter
    75%
    Foreign Institutions
    3.1%
    Mutual Funds
    2.4%
    Domestic Institutions
    3%
    Public
    18.9%
    Promoter
    75%
    Foreign Institutions
    3%
    Mutual Funds
    2.2%
    Domestic Institutions
    3.2%
    Public
    18.8%
    Promoter
    75%
    Foreign Institutions
    3%
    Mutual Funds
    2.2%
    Domestic Institutions
    3.2%
    Public
    18.9%
    Promoter
    75%
    Foreign Institutions
    2.7%
    Mutual Funds
    1.9%
    Domestic Institutions
    2.9%
    Public
    19.4%
    Promoter
    75%
    Foreign Institutions
    2%
    Mutual Funds
    1.8%
    Domestic Institutions
    2.7%
    Public
    20.3%

    Schneider Electric Infrastructure Technical Analysis

    Moving Averages Analysis
    821.35
    Current Price
    Bullish Moving Averages
    3
    Bearish Moving Averages
    13
    Day EMA5
    832.60
    Day EMA10
    840.20
    Day EMA12
    841.20
    Day EMA20
    843.10
    Day EMA26
    844.60
    Day EMA50
    848.70
    Day EMA100
    835.30
    Day EMA200
    799.60
    Day SMA5
    837.70
    Day SMA10
    848.50
    Day SMA20
    839.80
    Day SMA30
    838.50
    Day SMA50
    853.20
    Day SMA100
    863.70
    Day SMA150
    796.70
    Day SMA200
    759.60
    Delivery & Volume
    Loading chart...

    Delivery & Volume

    PeriodCombined Delivery VolumeNSE+BSE Traded Volume
    Day Rs
    61578 Rs
    122586 Rs
    Week Rs
    107247 Rs
    218073 Rs
    Month Rs
    85306 Rs
    177105 Rs
    818.48
    Pivot
    Resistance
    First Resistance
    827.87
    Second Resistance
    834.38
    Third Resistance
    843.77
    Support
    First Support
    811.97
    Second support
    802.58
    Third Support
    796.07
    Relative Strength Index
    44.03
    Money Flow Index
    60.29
    MACD
    -3.40
    MACD Signal
    -1.21
    Average True Range
    30.47
    Average Directional Index
    18.31
    Rate of Change (21)
    -0.95
    Rate of Change (125)
    31.93

    Name
    Holding Percent
    Nippon Life India Trustee Ltd-A/C Nippon India Multi Cap Fund
    1.36

    Schneider Electric Infrastructure Latest News

    12 NOV 2025 | Wednesday

    Schneider Electric Infrastructure Ltd - 534139 - Announcement under Regulation 30 (LODR)-Earnings Call Transcript

    12 NOV 2025 | Wednesday

    Schneider Electric Infrastructure Ltd - 534139 - Announcement under Regulation 30 (LODR)-Newspaper Publication

    11 NOV 2025 | Tuesday

    Schneider Electric Infrastructure Ltd - 534139 - Shareholder Meeting / Postal Ballot-Notice of Postal Ballot

    View More

    Schneider Electric Infrastructure Share Price FAQs

    Schneider Electric Infrastructure share price is ₹821.35 in NSE and ₹821.2 in BSE as on 12/11/2025.

    Schneider Electric Infrastructure share price in the past 1-year return was 8.19. The Schneider Electric Infrastructure share hit a 1-year low of Rs. 540 and a 1-year high of Rs. 1052.

    The market cap of Schneider Electric Infrastructure is Rs. 19638.48 Cr. as of 12/11/2025.

    The PE ratios of Schneider Electric Infrastructure is 79.95 as of 12/11/2025.

    The PB ratios of Schneider Electric Infrastructure is 29.82 as of 12/11/2025

    The Mutual Fund Shareholding in Schneider Electric Infrastructure was 2.71% at the end of 12/11/2025.

    You can easily buy Schneider Electric Infrastructure shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

    The 52-week high and low of Schneider Electric Infrastructure share price is ₹1052 and ₹540 as of 12/11/2025.

    Please be aware that Schneider Electric Infrastructure stock prices are subject to continuous fluctuations due to various factors.

    Invest in Schneider Electric Infrastructure
    +91 -

    Popular Stocks
    316.35
    -1.40 (-0.44%)
    178.61
    -2.43 (-1.34%)
    308.80
    +3.00 (+0.98%)
    424.75
    -2.55 (-0.60%)
    388.65
    -6.95 (-1.76%)
    Top Gainers
    2,484.50
    +117.70 (+4.97%)
    2,769.80
    +112.60 (+4.24%)
    1,456.10
    +48.10 (+3.42%)
    3,131.80
    +84.80 (+2.78%)
    783.10
    +19.20 (+2.51%)
    Top Losers
    178.61
    -2.43 (-1.34%)
    402.15
    -5.45 (-1.34%)
    822.50
    -9.80 (-1.18%)
    1,181.80
    -9.70 (-0.81%)
    424.75
    -2.55 (-0.60%)
    Invest in Schneider Electric Infrastructure
    +91 -