Founded in: 1992
Managing director: Amit Khurana
Madhav Infra Projects Limited was incorporated on October 7, 1992. The Company operates in the fields of Highways, Urban Infrastructure, Real Estate and Energy. It is also engaged in power generation business i.e. Solar Hydro. During the year 2021, the Company implemented various projects through various clients as under: 1) EPC work of Rehabiliation and Upgradation of Road for Civil Package no. 14 via Aaron via Vidoriya, Raghogarh Ashok Nagar to Aaron Road (up to Sindh Road) 2) EPC work of Rehabiliation and Upgradation of Road for Civil Package no. P2A i.e. GunjRajnagar Road, LaundiMahoba Road, NawgongShrinagar Road, Baxawa Dalpatpuroad3) Improvement of Chandur Railway Telegaon Road SH297 (Section Chandur Railway to Telegaon), 32/200 to KM 49/155, Tal. Chandur Railway, Dist. Amravati.4) Improvement of Riddhapur Tilwsa Road SH 300 (Section Riddhapur to Tiwsa) KM 0/000 to KM 40/800, Taluka Morshil Tiwsa, Dist. Amravati. 5) Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and OM of 100 MW of Solar Power Generating System ranging from 1 MW to 2 MW at varwus substations/locations in Maharashtra, India. 6) EPC work for Development of Badi Baktara Shahganj Road on OMT basis in the state of Madhya Pradesh through SPV viz., Badi Baktara Toll Pvt. Ltd. 7) EPC work for maintenance of High level Bridge over Bina River Dhasan River with approach Roads on NH86 at Bhopal Sanchi Sagar Road in the State of Madhya Pradesh. 8) Civil Contract of development of Bandri Jaruwakheda, Nirtala Mandi Bamora, Damoh Hindoriya Patera, Prithvipur Niwari, Ajaygarh Toriya Bariyapur, and PaleraBaldeogarh in the State of Madhya Pradesh. 9) Supply and Commencing Rooftop Solar Photovoltaic Systems projects of 12 MW in the state of MP, 5 MW projects at various states viz., Gujarat, Rajasthan and Karnataka. 10) Widening and Reconstruction of Madhya Pradesh Major District Roads Upgradation Project (MPMDRUP) Package No.P18: Khalwa to Dedatalayi Road (MPMDR1922). 11) Widening and Development of Madhya Pradesh Major District Roads Upgradation Project (MPMDRUP) Package No. P 16: Berasia Narsinghgarh Road (MPMDR 2307), Narsingarh Berasia Road (MPMDR2504), Bhojapura Ahmedpura Road (Part 1) (MPMDR2309), Bhojapura Ahmedpura Road (MPMDR2606) and Doraha Ahmadpur Road (MPMDR2605). 12) Construction of Bridges on State Highways and Major district Road in Bhopal, Madhya Pradesh. 13) Supply, Installation, Testing, Commissioning and Comprehensive AMC of ongrid Solar PV Power Plants at Bhopal BP 50 KW, Guna BP 100 KW, Ujjain BP 80 KW and Raipur BP 80 KW. 14) EPC of 550 kWp On Grid Roof Mounted Captive Solar Power Project at Gujarat Refinery.During the year 2019, the Company implemented various projects through various clients as under: 1) EPC work for Development of Agar Sarangpur Road on OMT basis in the state of Madhya Pradesh through SPV viz.,Sarangpur Agar Road Pvt. Ltd. 2)EPC work for Development of Khalghat Manawar Road on OMT basis in the state of Madhya Pradesh through SPVviz. Khalghat Manawar Toll Pvt. Ltd. 3) Civil works for Auditorium Building and Chemical Teal Storage Building also to complete the left over job of Road and other civil structures work including Road, Gate and balance civil work for M/s ONGC Petro Additions Limited at Dahej, Gujarat. 4) Civil and Structural work for various utilities and off sites for revamp and capacity enhancement project at M/s. Bharat Oman Refineries Limited, Bina (MP).In 2023, the Company implemented projects through various clients following Design, Engineering, Supply Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 35 MW Solar Photovoltaic grid connected power plant at Lakadiya of Bhachau Taluka of Kutchh District around substation of GETCO in the State of Gujarat through Gujarat State Electricity Corporation Limited. Design, Engineering, Supply, Installation, Testing Commissioning of 15 MW (AC) Solar Photovoltaic Gridconnected Power Plant at ONGC site Vagra, Dist. Bharuch, Gujarat and post warranty Comprehensive Operation Maintenance through Oil and Natural Gas Corporation of India. Design, Engineering, Procurement Supply, Construction Installation, Testing, Commissioning, associated transmission system and Operation Maintenance for 07 years of 5 MW (AC) solar photovoltaic gridconnected power plant at ONGC, Hazira plant, dist. Surat, Gujarat through Oil and Natural Gas Corporation of India. Design, Engineering, Supply Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 35 MW Solar Photovoltaic grid connected power plant at Chhatar of Jamnagar District around substation of GETCO in Gujarat through Gujarat State Electricity Corporation Limited Design, Supply, Installation, Testing, Commissioning, Operation and Maintenance of various capacities Grid connected Rooftop Solar PV Power Project on BOT basis at various WTP sites of MIDC in Maharashtra through the Company Design, Engineering, Supply Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 5 MW Solar Photovoltaic grid connected power plant at Songaon of Amravati District around substation of MSETCL in Maharashtra through Energy Efficiency Services Limited. Design, Engineering, Supply Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 5 MW Solar Photovoltaic grid connected power plant at Sambhora of Amravati District around substation of MSETCL in Maharashtra through Energy Efficiency Services Limited.In 2024, the Company implemented projects through various clients following the Construction of Railway Over Bridge in liue of LC no. 25 in KM 1050 / 12 of Bina Katni Section between Sagar bus stand to Sadar Bazar Road, Near Dimple Petrol Pump in Sagar City Distt. Sagar (M.P.) Construction of Railway Over Bridge in Lieu of L.C. No. 47 / S.P.L. on Guna Ashoknagar Road in Distt. Guna (M.P.) Construction of Railway Over Bridge in Lieu of L.C. No.17, On Mugawli Chanderi Road in Distt. Ashoknagar (M.P.) Construction of Railway Over Bridge in Liue of Level Crossing No. 70 in KM 1141 / 1618 of BinaKatni Track on DamohBandakpur Road Distt. Damoh (M.P.) Construction of Elevated Corridor on RaisenGairatgangRahatgarh Road (Bina Irrigation Project) Construction of Bridges on State Highways and Major District Roads in Madhya Pradesh.
Read More