ATV Projects India Share Price

BSE
ATVPROJ •
BUY

1W Return

1M Return

6M Return

1Y Return

3Y Return

The current prices are delayed, login or open an account for live prices.
Start SIP in ATV Projects India Ltd
Stock Performance
52 Week Low - High
Today’s Low - High

Open

Prev. Close

Total Traded Value

View details of Market Depth
Fundamental

Market Cap (in crs)

Face Value

Turnover (in lacs)

Key Metrics
Qtr Change %
New 52W High in past week
11.4
TTM PE Ratio
Above industry Median
30.6
Price to Book Ratio
Low in industry
0.9
Dividend yield 1yr %
0
TTM PEG Ratio
PEG TTM is much higher than 1
9.8

ATV Projects India Ltd shareholding Pattern

Promoter
27%
Mutual Funds
0.4%
Public
70.6%
Promoter
27%
Mutual Funds
0.4%
Public
70.6%
Promoter
27.1%
Mutual Funds
0.4%
Public
70.4%
Promoter
27.1%
Mutual Funds
0.4%
Public
69.9%
Promoter
27.1%
Mutual Funds
0.4%
Public
69.9%
Promoter
27.1%
Mutual Funds
0.4%
Public
69.9%
Foreign Institutions
0.9%

ATV Projects India Ltd Technical Analysis

Moving Averages Analysis
Moving Averages Analysis
Current Price
Bullish Moving Averages
7
Bearish Moving Averages
9
5Day EMA
36.40
10Day EMA
36.20
12Day EMA
36.00
20Day EMA
35.60
26Day EMA
35.30
50Day EMA
34.30
100Day EMA
31.80
200Day EMA
27.40
5Day SMA
37.50
10Day SMA
36.30
20Day SMA
35.00
30Day SMA
34.90
50Day SMA
34.60
100Day SMA
31.90
150Day SMA
28.30
200Day SMA
26.40
Delivery & Volume
Day
Combined Delivery Volume- 61290 Rs
NSE+BSE Traded Volume- 109430 Rs

Week
Combined Delivery Volume- 74893 Rs
NSE+BSE Traded Volume- 100449 Rs

Month
Combined Delivery Volume- 38928 Rs
NSE+BSE Traded Volume- 45664 Rs

Resistance & Support
34.97
Pivot
Resistance
First Resistance
35.72
Second Resistance
36.74
Third Resistance
37.49
Support
First Support
33.95
Second support
33.20
Third Support
32.18
Relative Strength Index
47.87
Money Flow Index
59.88
MACD
0.74
MACD Signal
0.60
Average True Range
2.01
Average Directional Index
13.08
Rate of Change (21)
3.58
Rate of Change (125)
68.45

ATV Projects India Ltd Company background

Founded in: 1987
ATV Projects India Limited was incorporated in Feb.87 to take over Anand Tanks Vessels (P) Ltd, engaged in the business of executing turnkey projects. The amalgamation was effective from Sep.87. Presently the company is engaged in execution of turnkey projects and supply of equipment for several industries such as Sugar, Fertilizer, Chemical, Petrochemicals, Steel, Power, Nuclear Power etc. by manufacturing the part of the equipments and components at its plant at Mathura. During 198889, an agreement was signed with Ishiwakajima Harima Heavy Industries Company, Japan, for the expansion and modernisation of the companys Mathura works. In 199495, the Mathura works were modernised. Technical and technological excellence reinforced by recognition from the American Society of Mechanical Engineers for quality control has enabled this division to book and execute orders from companies like HPCL, IOCL, Mathura Refinery, Bindal Agro and so on. The project and construction division has commissioned projects like Indian Oil Corporations Khandla Bhatinda pipeline for Jaipur and Sidhpur, LPG Horton spheres at Karnal and Jamshedpur, NTPC, Farraka and Jai Kissan SSKs sugar plant at Yavatmal, Maharashtra.In 198889, an agreement was signed with SEMTPielstick, France, to produce generating sets. In the following year, ATV signed a technical collaboration agreement with Dadini Metallurgica, Brazil, to manufacture bagassebased boilers used in sugar plants. Production commenced in 199091. In 199192, ATV entered into an agreement with a Dutch organisation, Stock Industrial Engineering, to manufacture roller mills used in sugar plants. In the same year, ATV entered into a joint venture with two leading industrialists of Malaysia to set up an integrated sugar complex. In 199091, the company entered into a technical knowhow agreement with Filex Corporation, US, to manufacture thermoplastic elastomer (TPE). The project was implemented in Mar.95 at Nagothane, Maharashtra. Two Italian companies API and Softer will import 200 tpm and 300 tpm of TPE, respectively. ATV went in for forward integration in 1995, with the commissioning of compounding lines to cater primarily to the footwear market which mainly depends on imports for TPE/SBS compounds used for soling materials. It has promoted another company ATV Petrochem a Rs 3800mln project to manufacture purified terephthalic acid (PTA).During 199697, the company commissioned and handed over a 2500 TCD Sugar Plant of M/s Akola Sahakari Sakhar Karkhana Ltd at Akola. 100 MW Power plant project and utilities of Kerala State Electricity Board for Centrales Diesel Export, France is mechanically completed and the first unit was commissioned. The company is still executing some valuable projects for the state owned oil company Indian oil Corporation, namely ARU in Panipat Refinery, LPG Sphere and Bottling Plant in Manmad and Gandhar.During the year 199798, the company was referred to the BIFR because the losses were exceeding its networth. The companys rehabilitation proposal is yet to be finalised by the IDBI, the OA and BIFR.In 2016, Company Division at Mathura was put to operation and undertaking works for Power, Cement, Sugar and other industrial sectors a heavy duty plate Bending Machine was added to augment the capacity of the Mathura Unit. The Mathura Plant became fully equipped to undertake fabrication of critical equipments required in Hydrocarbon, Cement, Hydro Power, Steel, Sugar Power sectors. It rocured new machines such as welding machine to enhance fabrication facility of Steam Distribution Duct required for air conditioning system of Power Plants during the year 201920. In 202223, it installed some additional new machines and replaced the old machines with new modern machines such as welding, drilling, Grinding, Cutting machines etc it installed a VTL (Vertical Turret Lathe) which is already in operations.
Read More

ATV Projects India Ltd FAQs

The past 1-year return of ATV Projects India Ltd [ATVPROJ] share was 148.56. The ATV Projects India Ltd [ATVPROJ] share hit a 1-year low of Rs. 12.02 and a 1-year high of Rs. 41.5.

The Mutual Fund Shareholding was 0.43% at the end of .

You can easily buy ATV Projects India Ltd shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Open Demat Account
+91 -

personImage
Open Demat Account
+91 -