Artefact Projects Ltd

BSE
BUY

1W Return

1M Return

6M Return

1Y Return

3Y Return

Start SIP in Artefact Projects Ltd
Stock Performance
52 Week Low - High
Today’s Low - High

Open

Prev. Close

Total Traded Value

View details of Market Depth
Fundamental

Market Cap (in crs)

Face Value

Turnover (in lacs)

Resistance & Support
Pivot
Resistance
0
0
0
Support
0
0
0

Artefact Projects Ltd Company background

Founded in: 1987
Artefact Projects Limited was incorporated in year 1987. The Company, inspired by Vishwakarma, the Engineering deity revered in India, undertook to establish itself in the field of consultancy for infrastructure and specialized project services since late go. The Company is providing project services for Highways, Urban Infrastructure, Airports, Mining Services Railways. It focused on surface transportation, urban planning and development, airport terminals and provision of soft wear to infrastructure development. The Company offer preparation of detailed engineering, designs and project repo planning, traffic studies and forecasts, and advisory services, such as financial, legal, contracts and documentation. Its project management services include bid and contract management project supervision and project implementation management operation and management of existing infrastructure, and quality analysis (QA) and technical auditing. In 1998, the company ventured into Infrastructure Consultancy Services as Engineers, Planners Project Management Consultants. In 2010, Company projects comprised of Chhattisgarh Rural Roads Development Project, 6 Laning of Vadodra Bharuch (NH8) in Gujarat and Krishnagiri to Thopurghat (NH7) in Tamil Nadu.In 2011, the Company formed a subsidiary called Artefact Infrastructure Limited. The Companys Global Design, Research and Training Centre project at Nagpur was completed. In June, 2012, the Company acquired additional 6% Equity Shares of Artefact Infrastructure Limited (AIL) and accordingly AIL became Wholly Owned Subsidiary of the Company.In 2011, the Company completed project assignments such as Independent Consultancy Services for 4/6 laning BOT Project of Chattisgarh / Maharashtra Border Wainganga Section of NH6 (client NHAI) Independent Consultancy Services for 4/6 laning of Jhansi Lalitpur Section of North South Corridor (NHDP Phase II) in the State of Uttar Pradesh on BOT basis consultancy package NS1/IC/MP 3(client NHAI) Independent Consultancy Services for 4/6 laning BOT Project from Kumarpalayam to Chengapalli on NH47 in the State of Tamil Nadu on North South Corridor under Phase II programme of NHDP.In 2014, the Company commenced operations for projects following the Four laning of NagpurWainganga Bridge Section from km 498.00 to km 544.20 of NH6 in Maharashtra on DBFO pattern under NHDP Phase III Reg. Independent Engineer services for Operation and Maintenance of KotaBaran Section km 388.263 to km 492.322 of NH76 in the Rajasthan State on OMT basis (Package8). Tender for carrying out Services in Construction and DLP Consultancy for Extended MUIP Works for Widening and Improvement of Nalasopara Nirmal MDR39 for 12.50 km length with bridges for 2+2 lanes (Pakage VII) Independent Engineer services for Four laning of Solapur Maharashtra/ Karanatka border section of NH9 from Km 249.00 TO Km 348.800 under NHDP PhaseIII in the Maharashtra State on BOT (TOLL) basis Independent Engineer services for 4 Laning of MulbagalAP/KNT Border section of NH4 from km 216.912 to km 239.100 in the State of Karnataka Independent Engineer services for Four Laning of AmravatiJalgaon Section of NH6 from km 166.725 to km 441.950 in Maharashtra Independent Engineer services for Six Laning of NH4 from Walajahpet to Poonamallee (km 13.800 to km 106.800, approx. length 93.000 km) in the Tamil Nadu State on DBFOT Basis under NHDPPhase V. Independent Engineer services for Four Laning of JalgaonMaharashtra/Gujarat Border Section of NH6 from km 441.950 to km 650.794 under NHDP PhaseIV in the state of Maharashtra. Independent Engineer services for four Laning of Walayar Vadakkancherry from existing Km. 182.250 to Km. 240.000 (Design Length = 54.00 Km.) in the State of Kerala under NHDPPhaseII to be executed on BOT (Toll) on DBFOT Basis (Package No. Ns2/BOT/KL2/Phase II). Independent Engineer services for FourLaning of Rajsamand (NH8)GangapurBhilwara (NH79) in the section of NH758 (from km 0.000 to km 87.250) in the state of Rajasthan under on Design, Build, Finance, Operate and Transfer (toll) basis. Independent Engineer services for Operation and Maintenance for Hyderabad Banglore section km 211.000 to km 462.164 on NH7 (Length 252 Km) in the state of Andhra Pradesh on OMT basis (Package13).
Read More

Artefact Projects Ltd FAQs

You can easily buy Artefact Projects Ltd shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Open Demat Account
or Resume your Application
+91 -

personImage