A B Infrabuild Share Price

BSE
148.2
-0.80 (0.67%)
ABINFRA • 13 Jun, 2025 | 03:30 PM
BUY
The current prices are delayed, login or Open Demat Account for live prices.
A B Infrabuild Stock Performance
Today’s Low - High
145.00
149.50
145.00
149.50
52 Week Low - High
61.77
150.00
61.77
150.00

Open

149.50

Prev. Close

149.00

Volume

1,642.00

Total Traded Value

2.41 L

View details of Market Depth
A B Infrabuild Fundamental

Market Cap (in crs)

937.74

Face Value

10

Turnover (in lacs)

2.41

Key Metrics
Qtr Change %
New 52W High in past week
60.1
Dividend yield 1yr %
0

A B Infrabuild shareholding Pattern

Promoter
37.1%
Public
62.9%
Promoter
32.7%
Public
67.3%
Promoter
36.8%
Public
63.2%
Promoter
36.8%
Public
63.2%
Promoter
36.8%
Public
63.2%

A B Infrabuild Technical Analysis

Moving Averages Analysis
Moving Averages Analysis
148.2
Current Price
Bullish Moving Averages
15
Bearish Moving Averages
1
5Day EMA
146.30
10Day EMA
143.10
12Day EMA
141.60
20Day EMA
134.90
26Day EMA
130.20
50Day EMA
116.80
100Day EMA
103.00
200Day EMA
89.00
5Day SMA
147.10
10Day SMA
143.40
20Day SMA
136.50
30Day SMA
124.60
50Day SMA
108.60
100Day SMA
95.50
150Day SMA
92.00
200Day SMA
88.00
Delivery & Volume

Delivery & Volume

PeriodCombined Delivery VolumeNSE+BSE Traded Volume
Day Rs
14910 Rs
14910 Rs
Week Rs
39910 Rs
39910 Rs
Month Rs
64578 Rs
119076 Rs
Resistance & Support
147.12
Pivot
Resistance
First Resistance
149.14
Second Resistance
151.41
Third Resistance
153.43
Support
First Support
144.85
Second support
142.83
Third Support
140.56
Relative Strength Index
72.14
Money Flow Index
79.89
MACD
11.34
MACD Signal
11.67
Average True Range
6.84
Average Directional Index
60.38
Rate of Change (21)
39.11
Rate of Change (125)
63.02

A B Infrabuild Latest News

30 MAY 2025 | Friday

A B Infrabuild Ltd - 544281 - Announcement under Regulation 30 (LODR)-Newspaper Publication

29 MAY 2025 | Thursday

A B Infrabuild Ltd - 544281 - Board Meeting Outcome for Outcome Of Board Meeting

29 MAY 2025 | Thursday

A B Infrabuild Ltd - 544281 - Financial Results For The Year Ended 31 March, 2025

View More

A B Infrabuild Company background

Founded in: 2011
Managing director: Amit Bholanath Mishra
A B Infrabuild Limited was originally incorporated as a Private Limited Company with the name A B Infrabuild Private Limited at Mumbai on March 16, 2011. The name of the Company was changed to A B Infrabuild Limited consequent to the conversion of the Company into a Public Limited Company on June 20, 2018. The Company provides various services such as civil and structural work, new station infrastructure, redevelopment of old stations, new railway lines, gauge conversion, track linking, track formation, building of Rail Over Bridge, Foot Over Bridge etc. It is engaged in the development of infrastructure and has completed construction of Road Over Bridge ( ROB ) at various stations in the Central Railway and the Western Railway, Construction of Foot Over Bridges, Skywalks and elevated booking offices at many railway stations for the Mumbai Railway Vikas Corporation Ltd, Construction of new platforms for Western Railway, Construction of new Station Buildings for Western Railway and also done repairs to approach roads for Western Railway.In April 2011, Company set up Solid forming unit of RMC Plant (Ready Mix Concert). It started manufacturing the cement slabs required in construction of building and roads. The Company took over the business of AB Enterprises, the proprietorship concern of the Promoter, Mr Amit Bholanath Mishra as per Agreement dated January 23, 2012 for a total consideration of Rs. 177,15,980 which was paid by way of allotment of 17,71,598 Equity Share of Rs. 10/ each at par. AB Enterprises was formed in the year 1999. AB Enterprises used latest technology in construction and high quality design work, Railway Tracks, Sub Station offices, Interior Exterior of Railway Station, Roads sky walks, etc. AB Enterprises was involved in the construction contracts of Government departments like Railways, MTNL, BMC, PWD since its inception.In year 2003 to 2007, AB pioneered in bringing the latest and high end technology and Machineries, which includes: Cement Concrete Mixers on Tilting mixers, Air compressors with double Jack Hammers, Road Rollers Diesel Generators, Dewatering / Sewage pumps, Theodolite, CTM with other lab equipments, Weigh Batcher, Welding Machines, Auto Level Instruments, Needle / Plate / Screed Vibrators, Steel Scaffolding, Ace Hydraulic Mobile Crane, Terex JCB which helped them for execution of contracts. In 201415, the Company also ventured into Road works bagging its first contract from MCGM. The Company is an ISO 14001:2004, IS9001:2008 OHSAS18001:2007 accredited along with certification from BM TRADA for compliance of ISO OHSAS certification. It is a Grade AA Contractor registered with the Municipal Corporation of Greater Mumbai and Class I (A) Contractor with Public Works Department, Maharashtra. The Company has set up its Ready Mix Concrete Plant at Kashimira, Thane District, Maharashtra and currently has a fleet of 15 Transit Mixers. The Company has also received a certificate of Compliance from Ready Mix Concrete Manufacturers Association. The Company made an IPO of 44,28,000 Equity Shares by raising money from public aggregating to Rs 12.84 Crore in July, 2019.In 2023, the Company completed Construction of ROB in lieu of existing level xing no 28/C at km 3637 Kharigaon in between Thane Kalyan Station Construction of FOBs, Skywalk, Platform with shelter and other works in connection with trespass control at Kanjurmarg Thane Stations in Mumbai Construction of elevated booking office, North South FOBs Platforms with platforms covers and service buildings like RRI and related structures at Oshiwara and extension of Harbour lines between ADHGMN stations of Western Railway under MUTP(LOTI) Construction of PEB platform shelter, platforms, subway and booking office building at Jogeshwari(NW) in connection with extension of Harbour lines between ADHGMN (MUTPII) Construction of new stabling lines including earthwork, bridge construction and linking of track etc at Vasai (South), Borivali (North), Goregaon (North) station on Western Railway (MUTPII) Construction of Station building, booking office, PRS, Quarters and dismantling goods shed including track work with other misc works at Vapi Navsari stations in connection with Western Dedicated Freight Corridor on VRST section of Mumbai Division of Western Railway Track works in connection with extension of harbour line from ADHGMN including supply of track fittings and ballast under MUTPII Rebuilding of North abutment of bridge no. 92 on Vaitarna South Creek between VaitarnaSaphale station of Mumbai Division of Western Railway on VirarSurat Station Extension / modification of bridges no. 41,43,46,47 48 in connection with extension of Harbour lines between Andheri to Goregaon station of Western Railway (MUTPII) Construction of road over bridge i.e. Jogeshwari (North) between km. 25/89 on pile foundation consist of RCC substructure / super structure with steel composite girder, RCC deck slab, POT PTFE bearing Construction of road over bridge i.e. Jogeshwari (South) between km. 23/1424/1 on pile foundation consist of RCC substructure / super structure with steel composite girder, RCC deck slab, POT PTFE bearing and carrying out work as per Railways approved drawing in lieu of level crossing no 24 25 between Jogeshwari Goregaon Stations of Western Railway Construction of elevated booking offices at Jogeshwari (North) and (South), extension / modification of the existing footover bridges at Jogeshwari station of Churchgate Virar Suburban section of Mumbai under MUTPII Construction of staircase and cast in situ box of 10m wide subway across up and down through track and platform No. 4 at Naigaon station as per new scheme between BorivaliVirar section of Mumbai Central Division in connection with quadrupling of tracks between BorivaliVirar section of Western Railway Jogeshwari (AT) repairs to road for good facilities at north side.

As of 13 Jun, 2025, ABINFRA share price is ₹146.9. The stock opened at ₹149.4 and had closed at ₹148.8 the previous day. During today’s trading session, ABINFRA share price moved between ₹145.00 and ₹149.50, with an average price for the day of ₹147.00. Over the last 52 weeks, the stock has recorded a low of ₹61.77 and a high of ₹150.00. In terms of performance, ABINFRA share price has increased by 68.8% over the past six months and has increased by 203.59% over the last year.

Read More

A B Infrabuild FAQs

A B Infrabuild share price in the past 1-year return was 0. The A B Infrabuild share hit a 1-year low of Rs. 61.77 and a 1-year high of Rs. 150.

The market cap of A B Infrabuild is Rs. 937.74 Cr. as of 13/6/2025.

The PE ratios of A B Infrabuild is 56.46 as of 13/6/2025.

The PB ratios of A B Infrabuild is 7.74 as of 13/6/2025

You can easily buy A B Infrabuild shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

Please be aware that A B Infrabuild stock prices are subject to continuous fluctuations due to various factors.

Open Demat Account
+91 -

Open Demat Account
+91 -