Lakshya Powertech Limited was originally incorporated as Lakshya Powertech Private Limited on July 20, 2012 with the Registrar of Companies, Gujarat, Dadra and Nagar Haveli. Further, the Company got its status converted to Public Limited and the name of the Company changed to Lakshya Powertech Limited and a fresh Certificate of Incorporation dated June 13, 2024 was issued by the Registrar of Companies, Ahmedabad.The Company is engaged in the business of providing consultancy, expert services, advises, designs, drawings in relation to Supervision and Control of Energy and Power projects in India and outside India and to undertake energy related projects involving heating, Gas Generators, Ventilation, Air conditioning, D.G Sets, Based power plants Packaging, Gas compressors and Oil Gas projects.The Company established as a consultancy company specializing in power generation in 2012. It diversified into Operations and Maintenance (OM) of Gas Power Generation in 2013. The commencement of Power Generation Projects marked a significant expansion in 2014. The Company further ventured into the Oil and Gas sector by widening their scope of services in 2015.In 2016, the Company secured an EPC Contracts in Renewables in Malaysia. It entered into a lumpsum turnkey projects in the Oil Gas Sector in 2018. The Company began OM contracts services for Gas Processing Plants and thereafter, diversified into Sewage Treatment Plant business, addressing environmental concerns and innovative solutions in 2019.In 2020, the Company set up direct operations and maintenance partnerships with PSUs, solidifying its presence in the Government Sector. It launched the own fabrication workshop, enhancing the project efficiency. In 2022, the Company entered the Coal Bed Methane Gas (CBM) and Compressed Biogas (CBG) Service Market. The Company emerged as a key backup power partner for top data center clients including Nxtra (Airtel), NTT and Sify in FY23.Company launched the IPO by issuing 27,72,800 equity shares of face value Rs 10 each by raising Rs 49.91 crores in October, 2024. In FY 2025, Company completed key projects like development of Gas Compression Station at ONGC CTF, Ankleshwar Kirloskar Pneumatic Company Ltd., Construction of compressor house including installation of Propylene unloading compressor with piping works in BOOT3 area of Propylene TT Unloading IOCL, Paradip Desalination Heater system Revamping Project, ONGC Navagam BHELHPVP, Development of Gas Compression Station atM/s GSPL India Transco Ltd, TadepalligudemAndhra Pradesh Kirloskar Pneumatic Company Ltd in the Oil Gas Division. In Power Infrastructure, it completed LSTK of 3 x 1000 K. It completed captive power plant for Rageshwari Gas Terminal (RGT) CairnVedanta Bridge Project of 90 MMSCFD Gas processing Megha Engineering infrastructure. In Renewable Energy, it completed Municipal Solid Waste Management Plant, Goa GMMCO Limited, 60 MLD STP Plant, Up, Jal Nigam, rozabad, Triveni Engineering Industries Limited and 100 MLD STP Plant, HUDA, Gurgaon Triveni Engineering Industries Limited. In Data Centers Division, Company has completed Amazon BOM 63 Data Center GMMCO Limited, Nxtra Airtel Data Center Powerica Limited and Amazon BOM 63 Data Center GMMCO Limited.
Lakshya Powertech Share Price Today
As of 1 Dec 2025, Lakshya Powertech share price is ₹122. The stock opened at ₹121.7 and had closed at ₹121.7 the previous day. During today’s trading session, Lakshya Powertech share price moved between ₹121.70 and ₹123.00, with an average price for the day of ₹122.35. Over the last 52 weeks, the stock has recorded a low of ₹102.25 and a high of ₹372.50. In terms of performance, Lakshya Powertech share price has declined by 28.6% over the past six months and has declined by 62.23% over the last year.