Twamev Construction & Infrastructure Share Price

    32.47
    -0.34 (-1.04%)
    TICL • 17 Oct, 2025 | 03:29 PM
    Buy

    1Y Annualised Return

    -38.69%

    3Y Annualised Return

    31.94%

    5Y Annualised Return

    70.57%

    10Y Annualised Return

    2.76%

    The current prices are delayed, login or Open Demat Account for live prices.

    Twamev Construction & Infrastructure Stock Performance

    1W Return8.49
    1Y Return-15.84
    Today's Low32.18
    Prev. Close32.81
    Mkt Cap (Cr.)503.29
    1M Return34.62
    3Y Return151.71
    52-Week High59.23
    Open33.00
    PE Ratio5.18
    6M Return-13.55
    Today's High33.06
    52-Week Low19.35
    Face Value1

    Twamev Construction & Infrastructure Company background

    Founded in: 1964
    Tantia Constructions Ltd is an Indiabased company. The company is engaged in general civil infrastructure solutions and executing infrastructure projects. They are specialized in railway infrastructure, bridges, Roads Highways, power transmission, pipelines, aviation, marine, urban development and buildings hospital. They have built roadways in the hills of Mizoram, coastal areas of Kerala, plains of Punjab and the hard plateau of Karnataka.Tantia Constructions Ltd was initially promoted by Late Govardhan Prasad Tantia and was incorporated on December 4, 1964 with the name and style of Tantia Constructions Company Pvt Ltd. In the year 1968, the company ventured into the building of bridges on well foundation. In the year 1976, they entered the premium segment of large diameter boring piles foundation for bridges and buildings. The company became a public limited company on May 27, 1982. In the year 1983, the company was listed on The Delhi Stock Exchange Association Ltd. In the year 1984, they received the largest single order of Rs 4 crore from Nalco. In the year 1990, they entered advanced mechanized road construction in line with the specifications of the Ministry of Surface Transport.In the year 1992, the company got largest single order of Rs 12 crore in Northeast India. Also, they constructed a guidebund on the River Brahmaputra and a road deck of 2.2 km bridge over the River Brahmaputra in Joghigopa, Assam. Since 1996, they received tenders for construction of Coastal Embankments, Hydraulic structures, Marine Infrastructure, Jetties. In the year 1997, the company entered Bangladesh to develop coastal and marine infrastructure. In the year 1998, they bagged NH 1 assignment from Panipat to Karnal. In the year 2001, they entered the niche sector of steel grider bridges and cantilever erection. Also, they completed a 1.25kmlong bridge from foundationtofinish over the River Saryu, Ayodhya. In the year 2003, the company won the prestigious JBICfunded dereservation of 15km tram tracks in Kolkata. In the year 2005, they bagged ADBfunded assignment of laying sewerage and drainage pipelines in Kolkata. Also, they entered the power transmission sector during the year.The name of the company was further changed to Tantia Constructions Ltd with effect from December 29, 2005. Since 2005, they started setting up of Transmission Lines and Airport Terminals: Aviation Infrastructure. The equity shared of the company was listed on Bombay Stock Exchange Ltd with effect from April 28, 2006.In the year 2006, the company completed the tram track project in Kolkata. In June 2006, they received two construction projects, namely construction of infrastructure work foundation work and construction of super structure work for bridge over river Krishna. In July 2006, the company secured a railway project worth Rs 195.31 million from North Central Railway, Allahabad for procurement, fabrication, assembly, erection and launching of 10 x 61 metre open web girder spans including fabrication and fixing of steel channel sleeper for Yamuna Bridge between Bhind and Etawah section in Uttar Pradesh.In the year 2007, the company completed the 220kv transmission line, Kumbhi Chini Mills project, a 64km state highway project in Karnataka, a Rs 157crore Patna road project and slum development project in Kolkata.In March 2007, the company received various new projects such as a project from West Bengal State Electricity Board for 33KV line in Rajarhat, Saltlake, Kolkata, a construction project of proposed six lane road over bridge at Bailey Road at the heart of city Patna from East Central Railway and a vision project of Chief Minister of Bihar for construction of major state highways in the districts of Buxar and Bhabua from Central Public Works Department.In November 2008, the company received 12 orders which included an order to build steel girders for Ircon International Ltd, and another from the Delhi Metro Rail Corp. In December 2008, they received order worth Rs 423.3 million to upgrade two hospitals in Mizoram.In December 2009, the company received a project for Construction of Road under Bridge near existing Railway level in DelhiBhatinda Section from Municipal Corporation of Delhi. In February 2010, they received a project from Brahmaputra Cracker and Polymer Ltd. for civil and structural works of ECU unit for Brahmaputra Petrochemicals Complex at Lapatkata, Assam.In 2010, the Company got into the BOT space through two projects, including Rs. 42 crore parkingcumcommercial project in Shimla and Rs 375 crore road project of 70 km in Bihar for NHAI. It made improvements and upgradation of state roads in Mizoram worth Rs 230 Crores.In 201112, it commissioned the ready mix concrete (RMC) plant at Guwahati. It completed the construction of a sewerage and drainage for BoroughI including House Connection at Kashipur, West Bengal. It completed installation of a 14 MLD Sewage Treatment Plant in Rajarhat.In 201314, it completed construction of foundation and substructure of bridge over River Matla, and other ancillary works in connection with Extension of New B G line beyond Canning to Bhangankhali costing Rs 50.35 Crores construction of 37 kms of RCC NP3 (modified) Gravity Sewer pipeline of varying diameters for KEIP, Kolkata at a contracted value of Rs 115.67 Crores construction of bridge across river Paglachandi in between stations Debogram and Paglachandi worth Rs 21.83 Crores Construction of 1.8 km long tunnel on a realigned path in connection with Udhampur Srinagar Baramulla Rail Link Project at a contracted value Rs 100 crores construction of Sewerage Drainage for Borough XV including House Connection for KEIP, Kolkata at a contracted value of Rs 106.09 crores construction of Inland Water Transport Terminal High Level Permanent RCC jetty over River Hooghly Khidirpore, Kolkata worth Rs 34.98 crores.In 2022, the Company achieved important milestones in the execution, completion and handling over of a landmark project at Mizoram Improvement and Upgradation Serchhip to Buarpui Road.

    Twamev Construction & Infrastructure Financial Highlights


    For the full year FY2025–2026, revenue reached ₹163.89 crore and profit touched at ₹55.98 crore.

    Twamev Construction & Infrastructure Share Price Today


    As of 18 Oct 2025, Twamev Construction & Infrastructure share price is ₹32.5. The stock opened at ₹33 and had closed at ₹32.8 the previous day. During today’s trading session, Twamev Construction & Infrastructure share price moved between ₹32.18 and ₹33.06, with an average price for the day of ₹32.62. Over the last 52 weeks, the stock has recorded a low of ₹19.35 and a high of ₹59.23. In terms of performance, Twamev Construction & Infrastructure share price has declined by 13.6% over the past six months and has declined by 38.69% over the last year.
    Read More
    Twamev Construction & Infrastructure SIP Return Calculator

    Over the past

    1 year
    3 years
    5 years
    Total Investment of ₹3,00,000
    Monthly SIP of 5,000 would have become 26,85,786 in 5 years with a gain of 23,85,786 (+795.26%)
    View details of Market Depth

    Twamev Construction & Infrastructure Fundamental

    Market Cap (in crs)

    503.29

    Face Value

    1

    Turnover (in lacs)

    95.02

    Key Metrics

    Qtr Change %
    45.18% Fall from 52W High
    13.6
    Dividend yield 1yr %
    0

    Twamev Construction & Infrastructure Key Financials

    View more
    Loading chart...
    Loading chart...
    Loading chart...
    Loading chart...
    Twamev Construction & Infrastructure Quarterly Revenue
    Jun 2025Mar 2025Dec 2024Sep 2024Jun 2024
    11.74 Cr
    49.73 Cr
    15.07 Cr
    12.34 Cr
    7.72 Cr
    Twamev Construction & Infrastructure Yearly Revenue
    Mar 2025Mar 2024Mar 2023Mar 2022Mar 2021Mar 2020
    163.89 Cr
    54.32 Cr
    108.78 Cr
    106.62 Cr
    105.05 Cr
    176.97 Cr
    Twamev Construction & Infrastructure Quarterly Net Profit/Loss
    Jun 2025Mar 2025Dec 2024Sep 2024Jun 2024
    1.1 Cr
    52.85 Cr
    1.77 Cr
    0.31 Cr
    0.99 Cr
    Twamev Construction & Infrastructure Yearly Net Profit/Loss
    Mar 2025Mar 2024Mar 2023Mar 2022Mar 2021Mar 2020
    55.98 Cr
    -22.22 Cr
    -2.16 Cr
    -2.05 Cr
    15.98 Cr
    308.33 Cr

    Twamev Construction & Infrastructure Shareholding Pattern

    Promoter
    85.1%
    Domestic Institutions
    0.1%
    Public
    14.7%
    Promoter
    89.4%
    Domestic Institutions
    0.2%
    Public
    10.5%
    Promoter
    94.3%
    Public
    5.7%
    Promoter
    94.3%
    Public
    5.7%
    Promoter
    94.3%
    Public
    5.7%
    Promoter
    94.4%
    Public
    5.6%

    Twamev Construction & Infrastructure Technical Analysis

    Moving Averages Analysis
    32.47
    Current Price
    Bullish Moving Averages
    15
    Bearish Moving Averages
    1
    5Day EMA
    31.50
    10Day EMA
    30.10
    12Day EMA
    29.60
    20Day EMA
    28.20
    26Day EMA
    27.70
    50Day EMA
    27.20
    100Day EMA
    28.40
    200Day EMA
    31.50
    5Day SMA
    31.70
    10Day SMA
    30.00
    20Day SMA
    26.70
    30Day SMA
    25.90
    50Day SMA
    26.20
    100Day SMA
    27.00
    150Day SMA
    29.40
    200Day SMA
    34.00
    Delivery & Volume
    Loading chart...

    Delivery & Volume

    PeriodCombined Delivery VolumeNSE+BSE Traded Volume
    Day Rs
    248612 Rs
    367095 Rs
    Week Rs
    712641 Rs
    1252929 Rs
    Month Rs
    726948 Rs
    1191918 Rs
    32.57
    Pivot
    Resistance
    First Resistance
    32.96
    Second Resistance
    33.45
    Third Resistance
    33.84
    Support
    First Support
    32.08
    Second support
    31.69
    Third Support
    31.20
    Relative Strength Index
    68.56
    Money Flow Index
    86.54
    MACD
    1.89
    MACD Signal
    1.11
    Average True Range
    2.11
    Average Directional Index
    36.63
    Rate of Change (21)
    34.62
    Rate of Change (125)
    -13.60

    Twamev Construction & Infrastructure Latest News

    08 OCT 2025 | Wednesday

    Twamev Construction And Infrastructure Ltd - 532738 - Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018

    27 SEP 2025 | Saturday

    Twamev Construction And Infrastructure Ltd - 532738 - Disclosure By The Company Wrt Sale Of Shares Executed By Mrs. Vijay Laxmi Tapuria.

    27 SEP 2025 | Saturday

    Twamev Construction And Infrastructure Ltd - 532738 - Disclosure By Mrs. Vijay Laxmi Tapuria, Wrt Sale Of Equity Shares Of Twamev Construction And Infrastructure Limited On 26.09.2025.

    View More

    Twamev Construction & Infrastructure Share Price FAQs

    Twamev Construction & Infrastructure share price is ₹32.47 in NSE and ₹32.72 in BSE as on 17/10/2025.

    Twamev Construction & Infrastructure share price in the past 1-year return was -15.83. The Twamev Construction & Infrastructure share hit a 1-year low of Rs. 19.35 and a 1-year high of Rs. 59.23.

    The market cap of Twamev Construction & Infrastructure is Rs. 503.29 Cr. as of 17/10/2025.

    The PE ratios of Twamev Construction & Infrastructure is 5.18 as of 17/10/2025.

    The PB ratios of Twamev Construction & Infrastructure is 1.11 as of 17/10/2025

    You can easily buy Twamev Construction & Infrastructure shares in Kotak Securities by opening a demat account and getting the KYC documents verified online.

    The 52-week high and low of Twamev Construction & Infrastructure share price is ₹59.23 and ₹19.35 as of 17/10/2025.

    Please be aware that Twamev Construction & Infrastructure stock prices are subject to continuous fluctuations due to various factors.

    Invest in Twamev Construction & Infrastructure
    +91 -

    Popular Stocks
    331.65
    -4.40 (-1.31%)
    172.22
    -1.78 (-1.02%)
    342.65
    -5.20 (-1.49%)
    412.80
    +1.00 (+0.24%)
    397.80
    -1.20 (-0.30%)
    Top Gainers
    2,507.80
    +98.10 (+4.07%)
    3,647.20
    +86.40 (+2.43%)
    1,202.70
    +27.40 (+2.33%)
    2,012.00
    +44.60 (+2.27%)
    412.15
    +7.00 (+1.73%)
    Top Losers
    240.90
    -12.91 (-5.09%)
    1,441.10
    -30.40 (-2.07%)
    1,486.20
    -28.80 (-1.90%)
    342.65
    -5.20 (-1.49%)
    1,447.60
    -16.20 (-1.11%)
    Invest in Twamev Construction & Infrastructure
    +91 -